We upgrade existing control systems to address recurring stoppages, replace obsolete components or give operators better visibility into the process.

  1. Survey
  2. Simulation
  3. Changeover
  4. Startup

Set a measurable goal

For example, a conveyor may stop frequently while the operator sees only a general fault. The first task is to record what happens before each stop and agree what information the operator needs.

Map the installed system

Review the equipment, wiring, software backups and connections to adjacent machines. Identify what can stay in service, what needs replacing and which functions must be available during the changeover.

Build and simulate

Prepare the revised logic and operator screens. Review normal operation and fault scenarios in simulation with the customer, and record the acceptance checks before scheduling the shutdown.

Plan the changeover

Agree the work window, responsibilities and conditions for returning to the previous configuration. After installation, verify signals and sequences on site and compare operation with the original goal.

A Lynx project

Control system upgrade for a pole welding line

We upgraded the pole welding line by replacing its Siemens S5 controllers, rewriting the control software and building a new operator interface.

Controllers
We replaced the legacy S5 controllers with new Siemens controllers.
PLC software
We rewrote the entire control program for the welding line.
Operator interface
We built the operator panel application from scratch.